Site preparation
1
4 Brocade Mobility RFS4000 Controller Installation Guide
53-1001933-02
• Ensure adequate, dust-free ventilation to all installed equipment.
• Identify and prepare Ethernet and console port connections.
• Verify that cable lengths are within the maximum allowable distances for
optimal signal transmission.
• Verify that the Brocade Mobility RFS4000 Controller is powered through an
Uninterruptible Power Supply (UPS).
MobilityRFS4000ControllerInstallGuide.book Page 4 Friday, June 10, 2011 1:32 PM
Comentarios a estos manuales