Solution Scope
Building an effective disaster tolerant solution can often be a very complex and time consuming task.
Furthermore most disaster tolerant solutions, implemented at customer sites, are often untested and may fail
to protect customers when failure occurs. Depending on the data center solution or application, the recovery
point objective and recovery time objective may differ from customer to customer. Any disaster tolerant
solution must be able to accommodate both planned and unplanned downtime.
Planned downtime
Planned downtime is a result of equipment of software maintenance that is disruptive to system operation
and usually cannot be avoided with a currently installed system design. In general, planned downtime is the
result of some logical, management-initiated event.
Unplanned downtime
Unplanned downtime results from a natural disaster, environmental anomaly or sudden hardware or
software failure and may impact an entire site. HP StorageWorks Continuous Access EVA and VMware
vCenter Site Recovery Manager offer an ideal solution, allowing you to move your data and secure your
mission critical applications to a safe offsite data center, away from harm.
This case study demonstrates a disaster-tolerant solution between two data centers in a campus or
metropolitan area. In this scenario, the data centers are merged through a shared dual redundant storage
area network (SAN) (see Figure 1). EVA 1 and EVA 2 are connected through the shared SAN and data
replicated synchronously with Continuous Access.